Improve 60% savings, 80% asset tracking and 10% terminal throughput
MRO support using Predictive Analytics for Intelligent decision making
Operator Training Simulator
Automated Train Supervision Development
Train Performance: Trip Optimizer – Dev and V&V
Industrial Software Development & Testing
ETCS Onboard Software Development & Testing
Interiors Design for a DMU Train with 66% cost saving and 100% on time delivery
Ensuring Quality Design Drafting for Plastic Silencer
$22K savings per set with optimized design of Surface Hydraulic System and Well Control Module
189kg weight reduction per wing set with 14% lesser fuel burn per seat
50% time reduction with Model Based Definitions of aero engine parts
Assembly process plan and production to reduce TAKT time to 3 days
30%+ savings with Digital Transformation of Next-Gen Engineering Tools
CNC Programming Support Using Esprit & NX